(Instruction to Casing head Installation)
1. Generals
T10 3/4 × 7 ( 5 1/2 ) -35 casing head is a product
designed in accordance with the user’s demand,
which is mainly used to fix the well mouth of
drilling well, to connect the casing column
in the bottom of well and to reliably seal and
control the circular space between casings,
and it’s a important component for oil (gas)
extraction device of oilfields. The basic parameters
are as follows:
Casing program: 10 3/4 × 7 ( 5 1/2 )
Surface casing: technical casing
2. Installation of Main Body of Casing head
2.1 Take out and store up the upper cap, slip
and other components after opening the box for
use while hanging oil casing.
2.2 Take out the main body of casing head after
the surface casing is being fixed, clean the
surface casing and the main body of casing head,
directly connect the main body of casing head
with the screw thread of surface casing with
7 inch drilling slip and fasten according to
the torque of casings.
2.3 Cautions:
Do not knock the ring groove and inner screw
threads on casing head body so as to prevent
from effecting the installation and sealing
performance of upper cap.
3. Installation of casing head and BOP before
second spud-in:
3.1 Scrub away each connection part between
the main body of casing head and BOP, coat lubricating
grease at steel ring groove.
3.2 Install the ring φ 388 into the ring groove
on the main body of casing head for hoisting
and nipple up of BOP.
3.3 When the BOP is aligned with ring groove
and seated after hoisting and nipple it up,
fasten it evenly with 16 stud bolts M42 × 3.
4. Installation of groupware inside the casing
head before completion:
4.1 Run the oil casing in a way that the last
casing connects with upper well-tie joint after
second artesian.
4.2 Uninstall the screw in slip groupware, buckle
two slips and slip seats on the bottom part
of well-tie joint and oil casing coupling, and
then fasten them with two inside hexagonal bolts.
Install orderly lower gaskets, rubber packing
and upper gaskets, then install and fasten 12
slip bolts, and complete the installation the
slip groupware.
4.3 Calculate correctly the distance between
the working plane of well-tie joint and the
taking-place position of slip (see Diagram 1)
, low down the slip to the well head, then lift
up well-tie joint 300 mm when it taking place,
and waiting for cementing and slurry. Reposition
the slip after cementing.
4.4 When BOP is lift up, check the slip if it
have been in the proper position. If the upper
part of slip groupware is at the bottom part
of casing head’s screw threads, it is showed
that the slip groupware has been in the right
place.
4.5 Installation of upper cap
4.6 Uninstall the lower well-tie joint and BOP;
rinse the screw threads of upper cap and screw
threads inside the main body of casing head;
coat lubricating grease, pay attention not to
scuff O seal ring; screw tightly 2 technological
bolts on the upper cap; when the upper cap and
screw threads are tightened by screwing subject
to the torsion moment standard, install the
protection cap and uninstall flange, installation
of casing head is completed fully.
|